A selection of key initiatives and projects I have led throughout my career.
Note: All images are my own.
Designed and installed two significant Quarry Pumping Systems at Breedon to ensure adequate dewatering of a new quarry bench and provision for future bench extensions deeper into the quarry.
A project developed with GPT-4 to translate messages with additional context for more accurate conveyance of text meaning for contacting international suppliers.
Currently at https://kenodonnell.ie/DeepTranslate/
Acted as Product Manager for a software project to upgrade an Inventory Application Approval System with a small team of Power App developers.
Installed two Kiln Pyrometer Camera systems used for temperature monitoring. Specified pipe routes, and CAD work to locate the best views without access into the live process.
Worked with structural engineers and fabricators to design and install Structural Steel Projects including three large platforms and two hoists.
Led an improvement that reduced equipment lubrication by a significant degree, saving the business €10k p/a.